London Road Phase 1: MacDuff Street to Kirkpatrick Street
UPDATE (SEPTEMBER 2021):
Following an
independent review
(PDF)
[6MB]
(opens new window)
in September 2021 which considered whether long-term sustainability and active travel benefits could be realised by retaining measures - all Spaces for People cycle lanes, including the one noted below will become permanent.
Project: | |
Location: | London Road Phase 1: MacDuff Street to Kirkpatrick Street |
Expected Work Start Date: | 29th June 2020 |
Expected Work Completion Date: | 17th July 2020 |
Measure(s): | Installation of a soft segregated cycle route and upgrades to existing bus stops |
Detail: | This measure shall be provided by means of reallocating 1 lane east and westbound from general traffic use and dedicating this to active travel. All current accesses both public and private along the route shall be maintained. |
Image of a section of completed work:
Related Content
Detailed maps
- London Rd detailed map 1 (PDF) [730KB] (opens new window)
- London Rd detailed map 2 (PDF) [781KB] (opens new window)
- London Rd detailed map 3 (PDF) [911KB] (opens new window)
- London Rd detailed map 4 (PDF) [1006KB] (opens new window)
- London Rd detailed map 5 (PDF) [547KB] (opens new window)
- London Rd detailed map 6 (PDF) [469KB] (opens new window)
- London Rd detailed map 7 (PDF) [469KB] (opens new window)